Project experience, versatility, and dedication take precedence in the world of construction. Pinnacle Construction has been commended for our quality of work, compliance with performance schedules, and cost control through favorable performance ratings, awards, and repeat work from Federal and civilian clientele. Our strong past performance is indicative of our ability to successfully execute tasks within this contract on time and within budget.

Pinnacle has over 15 years of past relevant task order type experience and current experience performing multiple concurrent task orders for general construction, alteration and repair of buildings, structures and other real property with U.S. Army, U.S. Navy, U.S. Air Force, NASA, GSA, NAVFAC, U.S. Department of Veteran Affairs, U.S. National Park Service (NPS), National Guard Bureau (NGB), U.S. Coast Guard and the USACE.

Our past task order projects had a broad range of technical complexity with values ranging from $100K to over $10M. Our demonstrated Design-Build and Design-Bid-Build experience includes multiple award delivery projects such as LEED certified new construction, renovation, alterations, repair, additions and upgrades, heating ventilation and air conditioning (HVAC), electrical, mechanical, steel fabrication, welding, demolition, painting, earthwork, fencing and paving.

Featured Projects

NASA Plum Brook Station Space Power Facility Sewage Treatment Plant

NASA Plum Brook Station Space Power Facility Sewage Treatment Plant

At NASA Plum Brook Station Space Power Facility (SPF), Pinnacle was tasked with separating the storm and sanitary connections for the facility by demolishing the 3,200 square foot Sewage Treatment Plant and associated utilities.
View Article

Cuyahoga Valley National Park System

Cuyahoga Valley National Park System

Cuyahoga Valley National Park updated its facility to accommodate increased utilization but also to meet sustainability goals, with special consideration to the needs of the ecosystem and energy requirements. Pinnacle installed two separate parking areas to achieve the access issues while protecting the nearby water.
View Article

"The site experienced challenges with severe temperatures and flooding, but [Pinnacle] worked efficiently and safely while remaining sensitive to the area."
-NPS
NASA Main Gate Phases I & II

NASA Main Gate Phases I & II

Location: Naval Support Activity, Mechanicsburg, PA Scope of Work: An existing timber frame structure, approximately 120,000 square feet in size was deconstructed. This historic structure was built in 1946. The project included timber reclamation of old growth wood with care taken to salvage the massive timber structures. The existing concrete pad, marking the footprint of…
View Article

GSA Potter-Stewart Federal Bldg. Renovation of Judicial Rooms

GSA Potter-Stewart Federal Bldg. Renovation of Judicial Rooms

Project Size: 3,500 square feet Project Scope: Interior build-out of 3,500 square feet of office space including Judges’ chambers, lobbies, law libraries and clerk work areas. The remodel and modernization project included abatement, electrical, plumbing, ceiling, painting, flooring and finish carpentry work. Actual Budget: $255,000 Phasing Plan: A phasing plan was required for this project…
View Article

Cuyahoga Valley National Park System

Cuyahoga Valley National Park System

Cuyahoga Valley National Park updated its facility to accommodate increased utilization but also to meet sustainability goals, with special consideration to the needs of the ecosystem and energy requirements. Pinnacle installed two separate parking areas to achieve the access issues while protecting the nearby water.
View Article

GSA Celebrezze Federal Bldg. Lobby Renovation

GSA Celebrezze Federal Bldg. Lobby Renovation

Project Size: 20,000 square feet Project Scope: The AJC Federal building had an aging metal panel ceiling, which had warped over the years. 275 panels were marked and removed from the ceiling, cleaned and straightened. The panels were reinforced with angle-irons to avoid the warping in the future. All panels were reinstalled in the same…
View Article

NASA Plum Brook Station Space Power Facility Sewage Treatment Plant

NASA Plum Brook Station Space Power Facility Sewage Treatment Plant

At NASA Plum Brook Station Space Power Facility (SPF), Pinnacle was tasked with separating the storm and sanitary connections for the facility by demolishing the 3,200 square foot Sewage Treatment Plant and associated utilities.
View Article

NASA SaRF (Shipping & Receiving Facility)

NASA SaRF (Shipping & Receiving Facility)

Project Size: 12,700 square feet Project Scope: Pinnacle constructed the 12,700 sqft Shipping and Receiving Facility (SaRF) which facilitates the receiving, documenting, screening and distributing of materials and equipment throughout Lewis Field, as well as the inspecting and sorting of incoming mail. As the final of three planned phases to Lewis Fields’ main gate security…
View Article

NASA-B2 Test Facility Accumulator Tank Relocation

NASA-B2 Test Facility Accumulator Tank Relocation

Location: NASA GRC Plum Brook Station Facility, Sandusky, OH Scope of Work: This project consisted of the re-location of five (5) existing accumulators and installing them on the new foundations near the B-2 Test facility. NASA’s Plum Brook Station’s Spacecraft Propulsion Research Facility (B-2) was designed to test full-scale rocket engines and upper stage launch vehicles…
View Article

NAVFAC Design Deconstruction, Restoration & Retention Basin

NAVFAC Design Deconstruction, Restoration & Retention Basin

Location: Naval Support Activity, Mechanicsburg, PA Scope of Work: An existing timber frame structure, approximately 120,000 square feet in size was deconstructed. This historic structure was built in 1946. The project included timber reclamation of old growth wood with care taken to salvage the massive timber structures. The existing concrete pad, marking the footprint of…
View Article

NPS Rockside Boarding Area- Parking Lot Installation & Eco System Balance

NPS Rockside Boarding Area- Parking Lot Installation & Eco System Balance

Location: Cuyahoga Valley National Park, Independence, OH Scope of Work: Cuyahoga Valley National Park updated its facility to accommodate the increased utilization but also to meet sustainability goals, with special consideration to the need of the ecosystem and energy requirements. Pinnacle installed two separate parking areas…
View Article

USACE Access Control Point DSCC

USACE Access Control Point DSCC

USACE ACCESS CONTROL POINT DSCC (Defense Supply Center Columbus) TYPE OF CONSTRUCTION | New Construction, Horizontal Construction, Vertical Construction, Site-work and Utilities. FINAL CONTRACT VALUE | $10.5M At the Defense Supply Center in Columbus, Ohio, Pinnacle transformed 15 acres of grassy fields into a state-of-the-art main gate which serves as the sole entrance for the…
View Article